top of page
Nixon Technology Campus
Augusta, Georgia
• +/- 387 Acres
• AT&T Fiber On-Site
• 30M Gallon Reclaimed Water Source Available
• Single-Story Design - Multi-Story Flexibility
• 2.5 MGD Closed-Loop System Available
• 600 MW +/- Power Capability
• Dedicated Land for On-Site Substation
• Public Water & Sewer Available
• Georgia Power Expansion: 20GW to 70GW
• Parcel Numbers: 1580006070, 1710008000 1710020000
bottom of page
